Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/17/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | ||
| 03/18/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 3-18-25, DWV not under test, add strapping to secure DWV, a 15 pound gage is required for gas pressure test, firefoam all penetrations at top plates, add a FH8 plate to exhaust in kitchen, add blocking or insulation to pex that is within 12 inches of can lights, missing kitchen island receptacles, add bank plates where electrical wires are within 1 1/2" of an edge. | |
| 03/19/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 19 March 25 Pass, okay to proceed with insulation and drywall. |