Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 02/19/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
2/19/25: wiring size not per plan at garage receptacles, properly secure Romex with 12" from box, grounding required at all metal boxes, seal all penetrations through vapor barrier and top plate, receptacle boxes at bathroom addition required at intermediate, boxes must be made up at intermediate inspection, registers must be blocked on three sides, BOCA plates required at plumbing pipes in bathrooms and secure all DWV vents. |
| 02/21/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
2/21/25 corrections made |