Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/03/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 10/19/23: plans call for split unit on side of house but gas pack was installed ( need trust calcs to verify that roof can support new unit). Also will need new gas BTU calculations for run to rooftop unit. stackable washer and dryer needs to be revised per plan, electrical panel needs to be revised to new location. 1/03/25, see notes above. revisions were not made. |
|
| 01/09/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 01/09/25 Passed |
|
| 09/11/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | ||
| 10/03/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 10/3/23: registers need to be blocked on 3 sides, fire foam top plate penetrations throughout house, H25 clips need to be completely nailed off, revise electrical plan to reflect current installation. STOPPED INSPECTION. | |
| 10/19/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 10/3/23: registers need to be blocked on 3 sides, fire foam top plate penetrations throughout house, H25 clips need to be completely nailed off, revise electrical plan to reflect current installation. STOPPED INSPECTION. 10/19/23: plans call for split unit on side of house but gas pack was installed ( need trust calcs to verify that roof can support new unit). Also will need new gas BTU calculations for run to rooftop unit. stackable washer and dryer needs to be revised per plan, electrical panel needs to be revised to new location. Ok to insulate walls only. |