Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Excavation/Rebar/Zoning
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/29/2025 | COT - RSBU - Excavation/Rebar/Zoning | Re-inspection required | 8.29.2025 Footing detail on plan requires another #4 continuous rebar on top, footing requires depth of 18" from ground to top of form. Verify green tracer wire on sewer drainage. |
|
| 09/03/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 9-3-25: corrections made-okay to pour concrete. |