Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-RES-0525-02365

Parcel: 138133140

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Excavation/Rebar/Zoning 

Date Description Inspector Results Comments
08/29/2025 COT - RSBU - Excavation/Rebar/Zoning  Re-inspection required 8.29.2025
Footing detail on plan requires another #4 continuous rebar on top, footing requires depth of 18" from ground to top of form. Verify green tracer wire on sewer drainage.
09/03/2025 COT - RSBU - Excavation/Rebar/Zoning  Passed 9-3-25: corrections made-okay to pour concrete.