Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Rough Soil
| Date |
Description |
Inspector |
Results |
Comments |
| 11/06/2025 |
COT - RSPL - Rough Soil |
|
Re-inspection required |
11-6-25: the photos you provided did not include all nailing on all exterior walls and the underground plumbing inspection was never requested nor inspected. Therefore, a letter from a licensed contractor must be submitted to the city for review and approval. The letter must document that all nailing for the exterior sheathing & under ground plumbing was done per approved plans and meets the 2018 IRC requirements. |
| 11/21/2025 |
COT - RSPL - Rough Soil |
|
Passed |
|