Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2025 | RSBU - Building Final | Re-inspection required | 10-31-25: hammer arrestors required for washer & dryer, weather resistant gfci receptacles are required at the exterior, install bubble cover receptacles-covers must be rated "heavy duty while in use." With the exception of the outstanding exterior clips/sheathing /framing inspection-please schedule all remaining inspections. NOTE: the exterior clips/sheathing/framing inspection was never inspected. If possible, provide pictures of anchor bolt spacing, all hardware to include hangers, H-25's, and hold-downs if any. Also, provide a video or photos with regard to nailing on the sheathing , drywall screw/or nailing spacing. Where unable to meet this request, a letter from a licensed contractor will be required documenting that the drywall shear wall & sheathing nailing together with all hardware was installed per the plans and meets the 2018 IRC. The letter would have to be submitted to the city for review and approval before a letter of completion could issued. Additionally and aside from the letter, we would require small sections of the drywall at the base be remove so that we could inspect anchor bolt spacing. |
|
| 11/06/2025 | RSBU - Building Final | Re-inspection required | 11-6-25: the photos you provided did not include all nailing on all exterior walls and the underground plumbing inspection was never requested nor inspected. Therefore, a letter from a licensed contractor must be submitted to the city for review and approval. The letter must document that all nailing for the exterior sheathing & under ground plumbing was done per approved plans and meets the 2018 IRC requirements. | |
| 11/21/2025 | RSBU - Building Final | Passed |