Inspection Status: Re-inspection required

Inspection History: RSBU - Building Final 

Date Description Inspector Results Comments
06/05/2025 RSBU - Building Final  Re-inspection required 6-5-25: firefoam all penetrations at top plates, add bank plates where 14/2 awg wire is closer than 1 1/4' to edge of stud, install knockout plugs at subpanel together with another at the main.
06/06/2025 RSBU - Building Final  Passed