Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 06/05/2025 |
RSBU - Building Final |
|
Re-inspection required |
6-5-25: firefoam all penetrations at top plates, add bank plates where 14/2 awg wire is closer than 1 1/4' to edge of stud, install knockout plugs at subpanel together with another at the main. |
| 06/06/2025 |
RSBU - Building Final |
|
Passed |
|