Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | Multiple lighting, wiring, and other electrical concerns raised by home owner as part of previous project from code case (work done without permit) to be verified by open pockets, photography/video, and other means of visible verification. All site work must be up to code and match approved plans. | |
| 09/03/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 8.3.26 1. Missing 2 small appliance circuit in the kitchen, must be on a 20A breaker. 2. Expose ceiling to inspect electrical above. 3. Remove island receptacles not code compliant. 4. Underground electrical conductors for island must be rated for wet location, do not pull Romex. 5. Expose exhaust duct for kitchen hood, must be rigid metal 6. Install water hammer arrestor for Dishwasher 7. Install water hammer arrestor for Ice Maker 8. Bang plates needed at studs to protect wires. 9. Add dedicated refrigerator receptacle. 10. Seal or remove old copper vent for kitchen sink. 11. Dishwasher and garbage disposal needs to be on GFCI. 12. Sill plate must be pressure treated. 13. Update plans to reflect all work being done to include hvac ductwork and diffusers. 14. Secure hi loop for dishwasher drain. 15. Ensure p-trap is plumb. |