Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/18/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Partial Pass | 5/18/2026 Partial pass pending hanger per D1-20 detail, D1-11 & D2-17 corner post connections. Roof joist modification details received and uploaded into permit. Verified added anchor bolt at marked locations 12" from sill plate edge and sister stud damaged stud upstairs as marked. |
|
| 05/29/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 05/29/2026 Corrections made to 5/18/26 inspection. |
|
| 05/29/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 05/29/2026 Corrections made to 5/18/26 inspection. DUPLICATE |