Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSOL - Electrical Final Solar Project
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2025 | COT - RSOL - Electrical Final Solar Project | Not Ready | Couldn't contact 6.30.25 | |
| 07/03/2025 | COT - RSOL - Electrical Final Solar Project | Passed | 7.3.25 DGC/BAT. PV system is installed as per plans. Proper conductors verified throughout. Proper breakers verified. Panel schedule is present. Address label present. Meter number recorded. Labeling present on all equipment and conduits. Equipment is properly secured. Proper grounding and bonding verified. DGC/BAT CLEARANCE TO TEP. |