Permit: TC-RES-0223-02945

Parcel: 136203570


Addresses:

3704 S MANITOBA AV

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
11/14/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required Not ready. Staples going through electrical lines and ABS. Add nail plates to anything that is less than an 1"1/4. Secure loose electrical lines. Secure exhaust vents. Smoke detector needs to be 6" away horizontal and vertically from the wall. Fire foam top penetrations. Top plates that been over notched need to have a 16 gage strap with minimum 8 nails on each end. Studs that been over notched due to plumbing need to have stud shoes. Hallway needs to be 36" at final. Receptacle at island are not in place. plans also call for a gas line to be installed. Too many issues. STOPPED INSPECTION. 11/14/2023
11/20/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 11/20/23: 1,load the roof. 2, approved plans not on site. 3, remove all trash/construction debris from site. 4, hallway framing will not result in a minimum 36" finish wall. 5, block all over-cut openings in the OSB shear wall. 6, support both ends of 4-gang elect boxes. 7, outlets are required on the wall within 6 feet of door opening. 8, fresh air intake is within 10 feet of a vent
11/30/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required (with fee) 11/30/23:. Roof not loaded, fire foam top plate penetrations at kitchen and master bathroom A/C line
12/05/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready 12/5/23: remove or contain all construction debris on site, over-notched bearing wall studs in front of bathroom, support flex duct every 4 feet with approved strap material (duct can not be supported by trusses or any other trades, flex duct size and register boxes do not match approved plans.
12/22/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12-22-23: All previous inspection notes have been corrected. Okay to proceed with insulation and drywall work.