Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - SewerÂ
| Date |
Description |
Inspector |
Results |
Comments |
| 05/22/2026 |
COT - RSPL - Sewer |
|
Re-inspection required |
5-22-26: expose pockets throughout exterior underground plumbing to verify piping, tracer wire, excavation depth. For all underground plumbing underneath slab a snake with camera will be required to verify proper flow and contains no blockages. A certified licensed plumber is required to perform test. Provide all results/ reports upon re-inspection and upload them to the city for review. Expose sewer for same. All underground plumbing together with sewer requires a pressure test. |