Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2026 | COT - RSPL - Plumbing Final | Re-inspection required | 01/22/2026 Temp and pressure relief valve must be gravity drained. Currently the T&P valve discharge pipe loops above valve and out to a wall, to which could not verify if terminated outdoors. No carbon monoxide detector installed, this is required since gas water heater is in the house. Provide drain pan to prevent leakage damage in the house. |
|
| 02/04/2026 | COT - RSPL - Plumbing Final | Passed | 02/04/2026 Approved per plan. All corrections made to 1/22/26 inspection. |