Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSEL - Electrical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/13/2023 | COT - RSEL - Electrical Final | Not Ready | pending solar | |
| 04/19/2023 | COT - RSEL - Electrical Final | Canceled | NR cancelled by field tech. Plans must be revised, approved by the City of Tucson and posted on site - TG | |
| 06/01/2023 | COT - RSEL - Electrical Final | Not Ready | 4/13/23 - Partial for meter adapter, DGL Clearance was called into TEP at 1:35 (power-kill) 4/19/23 - NR cancelled by field tech. Plans must be revised, approved by the City of Tucson and posted on site - TG 6/1/23: NR cancelled by field tech. Plans must be revised, approved by City of Tucson |
|
| 07/14/2023 | COT - RSEL - Electrical Final | Canceled | CA by contractor | |
| 07/19/2023 | COT - RSEL - Electrical Final | Re-inspection required | Denied, No plans on site. - installation does not match approved plans on file | |
| 07/27/2023 | COT - RSEL - Electrical Final | Passed | Approved. Corrections have been made. Revisions have been submitted. 7/27/2023 |