Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/13/2023 | BULD - Electrical Clearance | Partial Pass | Partial for meter adapter, DGL Clearance was called into TEP at 1:35 (power-kill) | |
| 04/19/2023 | BULD - Electrical Clearance | Canceled | NR cancelled by field tech. Plans must be revised, approved by the City of Tucson and posted on site - TG | |
| 06/01/2023 | BULD - Electrical Clearance | Not Ready | 4/13/23 - Partial for meter adapter, DGL Clearance was called into TEP at 1:35 (power-kill) 4/19/23 - NR cancelled by field tech. Plans must be revised, approved by the City of Tucson and posted on site - TG 6/1/23: NR cancelled by field tech. Plans must be revised, approved by City of Tucson |
|
| 07/14/2023 | BULD - Electrical Clearance | Not Applicable | ||
| 07/27/2023 | BULD - Electrical Clearance | Passed | Clearance for TEP DGC/DGL. 7/27/2023 |