Inspection Status: Partial Pass
Inspection History: RSBU - Building Progress
| Date |
Description |
Inspector |
Results |
Comments |
| 07/05/2023 |
RSBU - Building Progress |
|
Partial Pass |
Partial pass. looked at three trusses that have been sistered above the front bedroom with 2x6’s. plans ask for 2x8’s need to be submitted for revision. proceed at own risk. 7/5/2023 |
| 09/01/2023 |
RSBU - Building Progress |
|
Passed |
9/1/23: framing is good in addition to the west of main entry |
| 10/26/2023 |
RSBU - Building Progress |
|
Canceled |
Canceled per contractor. 10/26/23 |
| 10/31/2023 |
RSBU - Building Progress |
|
Re-inspection required |
10/31/23: support 4-gang box at entrance, seal penetrations through top plate, missing receptacles at kitchen (disposal switch, counter top), receptacle box missing at kitchen countertop, verify location of sub-panel, thermostat must be mounted no more than 54" above finish floor, bathroom exhaust fans not terminating through the roof, blocking required on 3 sides of A/C registers (missing in guest house),ground all metal boxes, DWV not under test. |
| 11/13/2023 |
RSBU - Building Progress |
|
Passed |
|