Inspection Status: Canceled
Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 08/27/2025 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Canceled |
Canceled per contractor. 8/27/2025 |
| 09/10/2025 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Re-inspection required |
9-10-25: not ready-missing CS16 Straps at beam to posts, missing H25's at girder truss bearing points at several locations, missing fire blocking at stairs-see 2018 IRC Section R302.11 for details, 1st. floor-verified anchor bolts spacing and shot pins only 2nd floor framing not inspected-still working on interior framing, add nails per per SW2 Schedule/see notes on details for shear walls. STOPPED INSPECTION-ADDITIONAL IYEMS MAY BE NOTED. |
| 09/24/2025 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Re-inspection required (with fee) |
9-24-25: add shot pins within 6" at the end of each sill plate, wrong straps used at post to beams-CS16 straps are required, 8-16D nails are required at the garage top plate splice, missing A34'S-see A6 Box Header detail, Screws/ nails at SW2 not per plan throughout, also exterior sheathing contains numerous over penetrated nails-add nails to sheathing where over penetrated more than 1/16", add nails on 2nd floor sill to decking-shear walls add 4 nails per cell and 2 for non-shear walls. |
| 09/26/2025 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Re-inspection required |
9/26/25: No access to house ( all windows and doors are boarded up), exterior sheathing must have fasteners spaced per schedule, fasteners shall not be closer than 3/8" from edge and shall not penetrate more than 1/8". Please recall inspection when boards are removed as some are covering hold downs and interior shear walls must also be inspected. |
| 09/29/2025 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Re-inspection required |
9/29/25: sheathing must be fastened per schedule, fasteners shall not penetrate more than 1/8", fasteners shall not be closer than 3/8" from edge, blocking required at edges of sheathing, anchors bolts required @32" o.c, (2) Anchor bolts required at sill plate 12" or larger, anchor bolts 12" from edge of sill plate max or 7 times the bolt diameter min. fasteners at 2nd floor sill plate to deck not complete. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
| 10/01/2025 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Passed |
|