Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/08/2026 | RSBU - Building Final | Re-inspection required | 1/7/26: Spalsh guards required at downspouts (drain away from foundation), WR receptacle required at entry exterior receptacle, water hammer arrestor required at dishwasher, properly secure dishwasher drain disposal highest point, UV tape required at exterior hose bib @ insulation, remove paint from water hammer arrestor at washer, | |
| 01/13/2026 | RSBU - Building Final | Passed | ||
| 12/17/2025 | RSBU - Building Final | Canceled | 12/17/2025 Canceled per contractor. |
|
| 12/19/2025 | RSBU - Building Final | Not Ready | 12/19/2025: Permit is contingent upon the installation of downspouts for all roof drains, extending to grade with approved splash guards, at 5409 S Ida Ln and 5413 S Ida Ln. Downspouts are required as part of this permit. |