Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
Permit Number - TC-MDP-1124-01281
Inspection Description - RSBU - Building Final
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/29/2025 | RSBU - Building Final | Re-inspection required | 7-29-25:,broken disconnect lever switch on main panel 2, missing EV breaker/label on each subpanel, label each panel for future solar, label each panel " non-metallic plumbing" NOTE: break off vacuum breaker screws to avoid theft. |
|
| 07/31/2025 | RSBU - Building Final | Passed | 7.31.2025: corrections made, approved. |