Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2025 | BULD - Electrical Clearance | Re-inspection required | There are four services at this address; Two of them are grounded per Code, none of them have two riser supports. | |
| 07/24/2025 | BULD - Electrical Clearance | Re-inspection required | Not ready. Meter base has been painted. It cannot be cleaned and has to be replaced. 7/24/2025 | |
| 07/25/2025 | BULD - Electrical Clearance | Passed | Not ready. Meter base has been painted. It cannot be cleaned and has to be replaced. 7/24/2025 7-25-2025 Meter base replaced with new one. Unistrut clamp added to riser. Approval TEP ECO Unit 1 & 2. |
|
| 07/25/2025 | BULD - Electrical Clearance | Re-inspection required | Not ready. Meter base has been painted. It cannot be cleaned and has to be replaced. 7/24/2025 7-25-2025: Not ready per prior inspection 7-24-2025. |
|
| 07/30/2025 | BULD - Electrical Clearance | Passed | 7/30/25 TEP CLEARANCE: ECO, UNITS 1,2,3,4. |