Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Interior Shear Bracing
| Date |
Description |
Inspector |
Results |
Comments |
| 11/13/2025 |
COT - RSBU - Interior Shear Bracing |
|
Re-inspection required |
11-13-25: add anchor bolts within north side at splice-a/b must be no closer than 5/8" from edge, nailing can be no closer than 3/8 from edges & cannot over-penetrate more than 1/8". Check shear walls spacing throughout-shear wall cannot be cut for trades. Replace and nail per plans, loose roof panels throughout, add shot pins within 6" of each end of inyerior plates-check spacing. STOPPED INSPECTION-ADDRIONAL ITEMS MAY BE ADDED. |
| 11/14/2025 |
COT - RSBU - Interior Shear Bracing |
|
Not Ready |
11-14-25: not ready-this inspection is for drywall nailing. |
| 12/11/2025 |
COT - RSBU - Interior Shear Bracing |
|
Re-inspection required |
12-11-25: add corrosion-resistant fasteners like Type 304 or 316 stainless steel, silicon bronze, copper, or hot-dipped galvanized steel at wet areas and reschedule. |
| 12/12/2025 |
COT - RSBU - Interior Shear Bracing |
|
Passed |
|