Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
12/02/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 12-2-25: ground all exterior metal pancake boxes, firefoam penetrations-any penetration stemming from an unconditioned space must be firefoamed, firefoam around electrical boxes at shear walls, seal vapor barrier above window in master bedroom, seal vapor barrier/tear north wall of bedroom 2, fix tears to flex at bedroom 2 & at den
12/03/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12.3.25
Corrections made as requested - approved