Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Roof NailingĀ 

Date Description Inspector Results Comments
11/13/2025 COT - RSBU - Roof NailingĀ  Re-inspection required 11-13-25: add anchor bolts within north side at splice-a/b must be no closer than 5/8" from edge, nailing can be no closer than 3/8 from edges & cannot over-penetrate more than 1/8". Check shear walls spacing throughout-shear wall cannot be cut for trades. Replace and nail per plans, loose roof panels throughout, add shot pins within 6" of each end of inyerior plates-check spacing. STOPPED INSPECTION-ADDRIONAL ITEMS MAY BE ADDED.
11/14/2025 COT - RSBU - Roof NailingĀ  Passed 11-14-25: roof inspection approved. Okay to dry-in roof.