Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-MDP-1024-01245

Parcel: 137042010


Addresses:

5385 S IDA LN

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
04/25/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 4/25/25: Receptacle spacing at kitchen not code compliant, secure NM cables 8" from box, seal all penetrations through top plate, secure DWV mid way in wall, wiring not made up at exhaust fans, ground all metallic boxes, secure condensate drain and refrigerant lines in wall, support refrigerator supply box, fresh air intake must be 10' from vents.
05/01/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 5-1-25, intermediate inspection approved. Okay to continue with construction.