Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Passed

Inspection History: COT - RSBU - Excavation/Rebar/ZoningĀ 

Date Description Inspector Results Comments
07/11/2025 COT - RSBU - Excavation/Rebar/ZoningĀ  Passed 7.11.25
Footer depth verified. Uffer verified. 3 inch clearance from rebar maintained throughout. Plumbing wrapped. Hold downs verified per plans. Diagonal rebar sections length and size verified per plans. Hold down depth verified. OK TO POUR.