Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/18/2026 | ENGR Engineering Final | Not Ready | 2/18/26 South side of house side yard- Drainage is not correct. Storm Water will pool on both sides of the drain block at screen wall. Correct the drainage here. |
|
| 04/07/2026 | ENGR Engineering Final | Re-inspection required (with fee) | Drainage issue on south side has not been corrected, need to maintain positive drainage throughout, no pooling or crossing of property line is allowed. | |
| 04/27/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. |