Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/17/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 8-17-26 loose anchor bolts throughout. Okay to continue with MEP's and will check at intermediates. | |
| 09/23/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 9/23/26: loose anchor bolts throughout 1st floor exterior walls, lower thermostat height to 48" o.c., provide laundry exhaust support at 4' intervals, tape flex tear at kitchen, provide support at marked location, fire foam top plate penetration at stair-see marked location, fire foam all around upstairs chutes, upstairs shower not under test, provide approved set of plans. Stopped inspection-additional items may be noted. | |
| 10/09/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Loose anchor bolts at marked areas. Provide 2 receptacles at marked areas in primary bedroom. Window in primary bathroom shall be tempered. Provide an additional receptacle in north bedroom. Add an additional support to duct; exceeding 4'. 10/9/2026 | |
| 10/15/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10/15/2026 All corrections made. |