Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
09/16/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 9.16.2025
In garage corner pop out needs foam at penetration, secure electrical line and add nail plate in garage, secure electrical lines at panel, update panel schedule and plan states conductor material is copper and not copper-clad - plan calls for 15A circuit but code E3703.5 requires 20A in garage (wire is white, should be yellow for cu clad 20A), DWV has leak in bathroom and same 3"line requires brace support, gas pressure test reading 13psi but requires 15psi, add staples at south shear wall and foam top plate as marked. Next inspector needs complete walkthrough in 1 & 2 floors. STOPPED INSPECTION, MORE ITEMS MAY BE FOUND.
09/17/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready
09/18/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9.18.2025
Corrections made to prior inspection on 9.16.2025 and walked second floor, added foam to penetrations and holes at sill plate. Shower in second floor holding water added. Staples added to main panel runs.