Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-MDP-0824-00893

Parcel: 116180040


Addresses:

919 W FRESNO ST

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
03/23/2026 ENGR Engineering Final Not Ready 3/23/26

There is No Accessible Route to Entrance of Residence. This requirement is stated on site plan. Route may originate from sidewalk, driveway, street or carport and is built from concrete sidewalk, pavers set in cement or stabilized DG.
Site Plan shows a 20’ wide driveway from Fresno street onto property. Driveway would need a Right of Way Permit. Build a driveway per plan. the DG you have now would be acceptable.
Reschedule Engineering Final when ready.
03/27/2026 ENGR Engineering Final Passed Accessible route OK.
Contractor built gate 14 feet wide gate for driveway on alley side of property. Confirmed with Engineering Associate Cory Hines that this was acceptable and per his prior approval.