Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/15/2026 | COT - RSPL - Rough Soil | Passed | 01/15/2026 Already passed on 10/7/25. |
|
| 03/14/2025 | COT - RSPL - Rough Soil | Partial Pass | 3/14/25: Plumbing underground per plans and under test. Ok to proceed with backfill. Shading required. tracer wire required on all plumbing underground outside of building. ensure gray water is installed at intermediates |