Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Preslab
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2025 | COT - RSBU - Preslab | Re-inspection required | 3/19/25: Reinforcement overlap must be 24" min, UFER ground not installed | |
| 03/20/2025 | COT - RSBU - Preslab | Passed |