Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2026 | ENGR Engineering Final | Not Ready | Conditions unsatisfied prior to final: Epoxy Anchors special inspections Post tension slab special inspections HCS Cap in driveway is loose and not glued correctly. |