Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2026 | ENGR Engineering Final | Not Ready | Outstanding conditions need to be satisfied prior to final. -HCS collar for cap needs to be glued to pipe in driveway. -Accessible Route will need to have post and cable fencing at both ends of the rear sidewalk removed. |
|
| 09/30/2026 | ENGR Engineering Final | Passed |