Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2026 | RSBU - Building Final | Not Ready | 07/07/2026 Not ready. Need to connect water and sewer and TEP electric power. Verified added elbow to pressure relief pipe near AC line set. |
|
| 09/23/2026 | RSBU - Building Final | Canceled | ||
| 09/30/2026 | RSBU - Building Final | Passed | 9/30/2026 All corrections made. Conditions satisfied. All utilities connected. |