Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | -Seal fire-block in garage at romex. 2-Connect Ufer to service. 3- Duct are too constricted in multiple areas. 4-Missing nal plate in Kitchen. 5- Dry vent connection for shower is below the centerline of drain. 6-Wet vent is too small per 39.4. Inspection halted; walk for compliance before re-scheduling. |
|
| 07/24/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Per notes. 3,5,6. Support gas lines 1st floor at every 8'. Receptacle I kitchen exceeds 2' from range. 7/24/2025 | |
| 07/29/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |