Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 06/06/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
6-6-25: add firefoam at marked location on stairs, loft, and at chute behind upstairs shower. Tape tears on flex at loft & chute at loft. |
| 06/09/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
6-9-25: firefoam penetrations at marked locations, fix tear on flex upstairs bedroom, seal all penetrations at T-Ply's |
| 06/11/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
6-11-25: seal penetrations t-ply in northwest and northwest bedroom of 2nd floor. Provide plans on reinspect to determine required clamps for interior load bearing walls. |
| 06/13/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|
| 06/13/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required (with fee) |
6-13-25: seal penetration of t-ply on second floor throughout . Areas marked in red. |