Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Roof Nailing
| Date |
Description |
Inspector |
Results |
Comments |
| 05/27/2025 |
COT - RSBU - Roof Nailing |
|
Re-inspection required |
5-27-25, add anchor bolts at marked locations, add nails along top to roof sheathing at garage, properly nail flush shot pins throughout and add pins to marked locations, fix tear at garage T-ply at garage shear wall. |
| 06/04/2025 |
COT - RSBU - Roof Nailing |
|
Re-inspection required |
6-4-25: Loose roof panels requiring correction had been documented on previous inspection and roof was shingled without approval. Submit a letter to the city for review/approval documenting that all roof nailing was done per plans and meets the 2018 IRC. This must be submitted and approved before a C of O can be issued. |
| 06/23/2025 |
COT - RSBU - Roof Nailing |
|
Passed |
6/23/2026. Letter has been submitted to the Department on roof nailing inspection. Taking the full responsibility of the nailing pattern. |