Inspection Status: Not Ready
Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 05/12/2025 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Not Ready |
1-Provide approved plans. 2-Remove and re-nail all shear and hood-down nails that missed the lumber intended got them. 3- Remove all extra sheeting, thermal ply, etc from roof to allow inspection. |
| 05/15/2025 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Re-inspection required |
Anchor bolts at shear wall in garage too close to edge of sil plate, must be within middle 3rd section. Missing anchor bolt at kitchen, 2 broken trusses at kitchen need engineering fix |
| 06/10/2025 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Passed |
6/10/25 corrections made |