Permit: TC-MDP-0225-00122

Parcel: 136130730

Inspection Status: Not Ready

Inspection History: COT - RSBU - Roof Nailing 

Date Description Inspector Results Comments
05/12/2025 COT - RSBU - Roof Nailing  Not Ready 1-Provide approved plans. 2-Remove and re-nail all shear and hood-down nails that missed the lumber intended got them. 3- Remove all extra sheeting, thermal ply, etc from roof to allow inspection.
05/15/2025 COT - RSBU - Roof Nailing  Re-inspection required Anchor bolts at shear wall in garage too close to edge of sil plate, must be within middle 3rd section. Missing anchor bolt at kitchen, 2 broken trusses at kitchen need engineering fix
06/10/2025 COT - RSBU - Roof Nailing  Passed 6/10/25 corrections made