Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/14/2026 | ENGR Engineering Final | Not Ready | 7/14/26 - Site-work is complete in accordance with approved plans. 'Prior to Final' conditions have not yet been satisfied. | |
| 07/15/2026 | ENGR Engineering Final | Not Ready | NW corner of backyard screen wall footer is undermined from stormwater out-letting from drain block. This needs to be repaired and compacted correctly. See picture attached. SW side yard is not draining properly at AC pad because drain block here is partially blocked. Cane stakes need to be removed from tree. Outstanding conditions need to be satisfied prior to final: -air leakage and duct tightness -post tension slab -post installed anchor inspection report -site preparation |
|
| 07/21/2026 | ENGR Engineering Final | Not Ready | 7/21/26 Drainage issue related to drain block at north east side has yet to be fixed, but that is something that needs to be done by civil/land. Otherwise, site work is sufficient. It is just the outstanding conditions that need to be satisfied prior to final. |