Inspection History Details
Inspection Status: Passed
Inspection History: RSBU - Building Progress
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/14/2025 | RSBU - Building Progress | Passed | 7.14.25 All receptacles are per plan and up to code. Firedoor at garage verified, thermostat height verified. Breaker schedule verified. No open unused areas at panel. Lines secured. AAV at island. Attic unit supported and installed per code. Max breaker for AC verified correct. Hammer arrestors verified. |