Permit: TC-MDP-0125-00028

Parcel: 141450530

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
06/26/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required Insulate water line in garage. Add nail plates to abs lines in kitchen area. Add fha plates to line sets both floors. Missing light box in closet. Staple in ABS line in master bathroom. 6/26/2025
06/27/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required Add fha plates to line sets both floors. DWV not on test. 6/27/2025
07/01/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required Add fha plates to dining area, floor truss, and second floor. 7/1/2025
07/02/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 7/2/25 fha plates added to dining room truss and second floor