Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Roof Nailing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2026 | COT - LCBU - Roof Nailing | Not Ready | 8/14/2026 Not ready. Nailing pattern not per schedule. Ensure nails do not penetrate sheathing more than an 1/8". Missing nails throughout. Stopped inspection. | |
| COT - LCBU - Roof Nailing | Partial Pass | 8.17.26 Various sheathing are soft and lost rigidity due to rain. |
||
| 08/24/2026 | COT - LCBU - Roof Nailing | Partial Pass | 8-24-26: partial pass-okay to dry-in rooftop. |