Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCPL - Plumbing Roof Drains
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2026 | COT - LCPL - Plumbing Roof Drains | Partial Pass | 9/1/26: plumbing intermediate & roof drains inspection- add insulation to hot pex lines above ceiling, add plastic bushings at in wall metal framing and secure pex lines, fire foam penetrations, add Boca plates where DWV is closer than 1 1/4" from edges, secure DWV at east wall of restroom, secure DWV within 2' of a bend at above ceiling. Total of 4-4" roof drains verified under test, DWV & Domestic lines verified under test at 100 psi. |
|
| 09/11/2026 | COT - LCPL - Plumbing Roof Drains | Partial Pass | 9/11/26: verified blocking at restrooms-okay to insulate in wall approved areas. Pending insulation at above ceiling plumbing and to verify supports. |