Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-COM-1224-02366

Parcel: 137073210


Addresses:

4945 S LIBERTY AV

Inspection Status: Partial Pass

Inspection History: COT - HCEL - Electrical Final 

Date Description Inspector Results Comments
03/24/2026 COT - HCEL - Electrical Final  Partial Pass 3-24-26: B102 approved.
03/31/2026 COT - HCEL - Electrical Final  Re-inspection required 3-31-26: install panel label and a label for disconnect, remove covers from smoke detectors, missing restroom door-required to test pounds of pressure, missing water heater door.
C105-install panel label and a label for disconnect, remove covers from smoke detectors, secure conduit/whip at water heater (add another clamp), missing pressure relief valve.
Note: a p-trap test for showers required. This was documented in previous notes.
04/01/2026 COT - HCEL - Electrical Final  Partial Pass 4/1/26: All issues listed above corrected. Pending electrical corrections at kitchen circuits per A117.1, pending correction at HVAC refrigerant lines and electrical whips. Revision required for HVAC system upsized to 2 ton (plans and Manual J require 1.5Ton)
04/07/2026 COT - HCEL - Electrical Final  Partial Pass 4-7-26: Building final for Unit C119 approved.
Note: will conduct a walk through of exterior items to include, A/C disconnect labeling/sealing, refrigerant lines, and revision for 1.5 to 2 ton unit.
04/23/2026 COT - HCEL - Electrical Final  Re-inspection required 4/23/26: Note: cannot occupy prior to an egress plan and a barrier from construction to the public. (Tenants) TCO will be required along with other items prior to occupancy. Fire-inspector approval required prior to issuance of TCO.
05/04/2026 COT - HCEL - Electrical Final  Partial Pass Partial pass. B205,B206,B207,B208,B209. Approved. Remove sticky pads and Ensure MC cable is properly secured. 5/4/2026
05/06/2026 COT - HCEL - Electrical Final  Partial Pass Partial pass. B210, B211, B212. Approved 5/6/2026
05/08/2026 COT - HCEL - Electrical Final  Canceled 5-8-26: canceled by contractor.
05/12/2026 COT - HCEL - Electrical Final  Partial Pass 5-12-26: MEP's together with Electrical, Plumbing, & Mechanical Finals at UNIT's B111 & B113 approved. This does not include Mechanical on the exterior which will be inspected when ready.
05/14/2026 COT - HCEL - Electrical Final  Partial Pass 5-14-26: mechanical, electrical, plumbing finals for Unit's B107 & B109 approved.
05/20/2026 COT - HCEL - Electrical Final  Partial Pass 5-20-26: mechanical, electrical, plumbing finals for Units B108, B106, B105, B104, A102 approved. Okay to apply for a Level 4 TCO.
05/27/2026 COT - HCEL - Electrical Final  Partial Pass 5-27-26: plumbing, electrical, mechanical finals for Unit's A101- provide a shower liner/pan test with 2" of water above the top of threshold, A110, A109-not ready, A111 -not ready. Okay to apply for a Level 4 TCO on Unit 110.
05/28/2026 COT - HCEL - Electrical Final  Partial Pass 5/28/2026 A101, A103, A109, A111, A113 approved. A12 not ready.
06/01/2026 COT - HCEL - Electrical Final  Partial Pass 6-1-26: plumbing, electrical, mechanical finals for Unit's C114 & C115 approved.
Note: in order to occupy these rooms you need to schedule a TCO inspection and apply for a Level 4 TCO.
06/03/2026 COT - HCEL - Electrical Final  Partial Pass 6-3-26: plumbing, electrical, mechanical final's for C117 & C112 approved. Schedule TCO inspection at your convenience.
06/04/2026 COT - HCEL - Electrical Final  Partial Pass 6-4-26: plumbing, electrical, mechanical finals for unit's C106 & C118 approved.
06/08/2026 COT - HCEL - Electrical Final  Partial Pass 6-8-26: C109& C102 electrical, mechanical, and plumbing finals approved.
06/09/2026 COT - HCEL - Electrical Final  Partial Pass 6-9-26: Electrical, mechanical, and plumbing finals for C103 & C108 approved.
06/15/2026 COT - HCEL - Electrical Final  Re-inspection required 6-15-26: plumbing final for room's C212 & C217 approved. Electrical & mechanical finals-see following notes:
Prior to arrival please ensure the following : remove all smoke detector covers, update panel schedules reflecting correct water heater breaker and install a " shackle" at the at the water heater breaker. Reschedule mechanical & electrical finals for these 2 rooms.
06/23/2026 COT - HCEL - Electrical Final  Not Ready 6.23.26
A108, C203, C204, C206, C207.
1. Condensers are too close to each other.
2. Support expansion tanks on water heater
3. Pending install of heat strips