Inspection History Details
Inspection Status: Requested
Inspection History: COT - HCBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - HCBU - Building Final | Requested | |||
| 02/20/2026 | COT - HCBU - Building Final | Re-inspection required | 2-20-26: called point of contact at 830am -no answer and unable to leave voice mail because it was full. Made contact with management at the office who said contractor was not on site and would be arriving sometime later. Please reschedule inspection at your convenience. | |
| 04/03/2026 | COT - HCBU - Building Final | Partial Pass | 4-3-26: Building final for Unit's B101, B102, C111, C105 approved. Note: we will do a final exterior walk through at a later date on listed above units to verify the following items: proper mounting/sealing of A/C Disconnects/labeling, Regrigerant lines, and revisions showing 1.5 ton to a 2 ton unit. |
|
| 04/07/2026 | COT - HCBU - Building Final | Partial Pass | 4-7-26: Building final for Unit C119 approved. Note: will conduct a walk through of exterior items to include, A/C disconnect labeling/sealing, refrigerant lines, and revision for 1.5 to 2 ton unit. |