Inspection Status: Partial Pass
Inspection History: COT - HCME - Mechanical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/24/2026 | COT - HCME - Mechanical Final | Partial Pass | 3-24-26: mechanical final approved. | |
| 04/01/2026 | COT - HCME - Mechanical Final | Partial Pass | 4/1/26: All issues listed above corrected. Pending electrical corrections at kitchen circuits per A117.1, pending correction at HVAC refrigerant lines and electrical whips. Revision required for HVAC system upsized to 2 ton (plans and Manual J require 1.5Ton) | |
| 04/07/2026 | COT - HCME - Mechanical Final | Partial Pass | 4-7-26: Building final for Unit C119 approved. Note: will conduct a walk through of exterior items to include, A/C disconnect labeling/sealing, refrigerant lines, and revision for 1.5 to 2 ton unit. |