Inspection Status: Not Ready
Inspection History: COT - FCON - Fire - Final
| Date |
Description |
Inspector |
Results |
Comments |
|
COT - FCON - Fire - Final |
|
Not Ready |
Hood shall be tied into alarm |
| 05/30/2025 |
COT - FCON - Fire - Final |
|
Partial Pass |
Approved for level2 TCO. FACP ad riser signage. EM lights and exit signs on south side of building. All debris out of egress paths. Labeled keys in Knox box. Inner doors main entrance sticking. Need dedicated function alarm to supervise sprinkler, ansul, and CO2 detector(if applicable).. If debris, EM lights and exit signs and exit door issues are addressed by 6/2/2025, a level 4 TCO can be obtained. Revised plans must be submitted and all dedicated supervisory systems must pass inspection before final. |
| 06/03/2025 |
COT - FCON - Fire - Final |
|
Partial Pass |
Approved for TCO level 4. Still need dedicated function system to monitor sprinkler and ansul. FDC locking caps and POA permit. |
| 12/03/2025 |
COT - FCON - Fire - Final |
|
Passed |
|