Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/13/2026 | ENGR Engineering Final | Not Ready | Bldg. # needs to be on building for emergency services. Sidewalk panel (3rd panel) in front of front door, where it connects to new sidewalk in front of bldg. 9 has cross slope over 2% |