Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCPL - Plumbing Intermediate
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/18/2026 | COT - LCPL - Plumbing Intermediate | Not Ready | Provide a minimum of 18" of stand pipe. Provide 4" in between trap weirs at laundry. Provide nail plates throughout electrical and plumbing. Exhaust ducts not completed. Seal all top penetrations. Pex not under test. Stopped inspection other items may occur. 5/18/2026 | |
| 05/21/2026 | COT - LCPL - Plumbing Intermediate | Re-inspection required (with fee) | 5-21-26: seal all top plate penetrations, add shot pins to marked areas and replace 7/16" anchor bolts with 1/2" anchor bolts at exterior wall behind washer/dryer, pex lines not under test, strap/secure all DWV & pex lines, per plans 18" are required from wall to center of water closet, Remove bench installed at shower. Stopped inspection-additional items may be noted | |
| 06/01/2026 | COT - LCPL - Plumbing Intermediate | Re-inspection required | 6-1-26: DWV not under test. Add backing for shower and water closet- see plans or City of Tucson Inclusive Home Design and verify ADA shower bench requirements. Reschedule inspection -another failed inspection will result with a re-inspection fee. Note: seal any vertical /horizontal penetrations between 2X4's and brick wall |
|
| 06/10/2026 | COT - LCPL - Plumbing Intermediate | Re-inspection required (with fee) | 6-10-26: DWV not under test. Note: grab bar is required at south wall next to water closet. |
|
| 06/11/2026 | COT - LCPL - Plumbing Intermediate | Passed | 6-11-26: plumbing intermediates approved. |